Swimming pools

Building a swimming pool in Balchik, Rogachevo

Building a swimming pool in Balchik, Rogachevo

Building a swimming pool in Balchik
This luxurious swimming pool was built in 2011 in a property where building company "Varaks"  was engaged to build it along with a villa. The pool is larger than the regular size for this kind of properties. It's dimensions are 10 x 5 meters.
It took 4 months to complete the building works of this swimming pool in Balchik. There are children section and steps available. The edge of the pool is decorated with elegant ceramic mosaic tiles for the perfect finish.

  • Start Date:02.2011
  • End Date:05.2011
  • Location:Balchik, Rogachevo village
  • Category: Swimming pools